    As Andy, I treat the 12/5 as being for signal equipment and the 5/2 for civil engineering. I don’t mix the two.
    Ian

    #3301
    richdannatt
    Participant

    Yes I do at North East Lincolnshire, I find it very important otherwise inferior products end up being used!

    #3238
    Anonymous
    Inactive

    Hi Jo I am not sure whether you are still interested but as a consultant we provide a number of documents to clients with regards to proposed signal installations. One of these is the 12/5 appendix which generally specifies the signals element and the civil elements such as duct depths, chamber depths and sizes etc we specify in the 5/2 appendix. If you would like an example of this please dont hesitate to email on andy.marson@greensignals.co.uk.

    #1035
    Anonymous
    Inactive

    Do any of you specify civils details in your 12/5 spec or your signal layout drawings? ie chamber depths/foundations, duct depths, tactile paving layouts/requirements etc?