Forums Forums Traffic Signs TSRGD 2016 Zebra & other crossings – 1997 Regs and TSRGD 2016 Reply To: Zebra & other crossings – 1997 Regs and TSRGD 2016

#4029

stu
June 2019

Thanks for your reply.

Similarly, the max distance between STOP line and studs on a Puffin crossing was 10m but hasn’t been retained in TSRGD. The DfT confirmed to me that that was indeed an error.

These omissions have now have rendered installation of these crossings practically impossible from a compliance point of view.